This Project consisted of removing the existing hot water piping system, installing new hot water piping and boiler, installing a new chilled water piping system and chiller, providing new room unit ventilators with cooling, installing a new DDC temperature control system and upgrading the existing electrical service. The project also included a completely new roof.
Services Rendered: HVAC and Electrical.
Project Features:
- Project was constructed in two phases.
- Direct primary chilled water piping system.
- Hybrid boiler system consisting of one condensing boiler and two non-condensing boilers.
- New DC temperature control to replace existing pneumatic system.
- CO2 demand control ventilation.
- Variable speed pumping for both hot and chilled water systems.
- All new insulated hot and chilled water piping systems installed in existing perimeter tunnel system.
- 200-ton packaged R-134A air-cooled Chiller.