This Project involved the renovation of the entire existing school building (approximately 40,625 sq. ft.) along with (2) new building additions (approximately 25,990 sq. ft.). Remodeling and new work included all new electrical and lighting design, HVAC, plumbing and fire protection systems.
Services rendered: Mechanical, Electrical, Fire Protection and Plumbing Design
Project Features:
- 168-ton VRF HVAC system with heat recovery.
- Multiple Dedicated Outside Air (DOA) units providing tempered air.
- (2) RTU's which serve the new Gym and Multi-Purpose Additions.
- Occupancy sensors and demand ventilation.
- 150 KW emergency generation for life safety and the FEMA storm shelter.
- All new LED lighting throughout the existing and new building additions.
- All new switchgear, panels, and feeders.
- New addressable fire alarm system with mass notification.
- Energy efficient and water conserving plumbing fixtures and equipment.
- New fire protection service serving both the existing building and new additions.