WES was part of the design team for the demolition of Queeny Tower on the campus for BJC in St. Louis, MO. This project involved designing systems to replace existing systems that would be eliminated with the demolition of this building. These systems are needed for other buildings that Queeny Tower connects to. Our design included the design and relocation of mechanical equipment.
Services rendered: Mechanical
Project Features: