WES is part of the design team for the renovation of this existing museum building. Design goals were to improve the safety and reliability of the building and associated systems by adding a service generator, updating the HVAC, lighting and security systems and upgrading the Fire Alarm system to voice.
Services rendered: Mechanical, and Electrical Design
Project Features:
· Surveyed existing electrical systems
· Generator product selection and design
· Power distribution systems redesign
· Inside and outside normal and emergency lighting design including an artificial skylight in the lobby entrance.
Provide power to new chiller and associated pumps
upgraded transformer and main electrical service
provisions for rental generator connection