WES was retained to the power requirements for the new bridge of the Mississippi River. Our design included navigation and aviation light, design of roadway lighting for bridge and approaches to the bridge, power for bridge maintenance the design included:
Services Rendered: Electrical
Project Features:
· 480V Systems
· New Unit Substation
· Roadway Lighting
· Navigational Lighting
· Aviation Lighting
· Power for Bridge Maintenance