WES was part of a design team to replace an old out of date chiller in the West Chiller Plant of the airport. new chiller to Our role was to provide the electrical design requirements.
Services rendered: Electrical
Project Features:
Design New Unit Substation Power Distribution System- 4160V to 480V
Converted Chiller and Pumps to 480V from 4160V
Design New VFDs to Control Pumps and Chiller
Busduct Distribution to Serve New Pump and Chiller